3 GA Grace
Stage 2 · CC
Halyard Wharf Apartments — Stage 2
212–220 Kurrajong Esplanade, Wentworth Point NSW 2127
Work
Dashboard Conditions & Checklist My Reviews 3 Certifier link Files & Evidence Approval Processes Activity
Share and export
Download & Export
Team and workspace
Members Settings
Home Projects Halyard Wharf Apartments — Stage 2 Requirements

Project stages

Completed Current Upcoming
  1. Development approval 14 Mar 2026
  2. CC Construction certificate Due 18 Nov 2026
  3. CW Construction 30 Jun 2027
  4. OC Occupation certificate 22 Sep 2027
  5. HO Handover 15 Oct 2027
Active 38Watching 6All 52
Search requirements… Status 2
Required itemStatusOwnerActivityDue dateAction
Structure 4 items
1 accepted · 1 in review · 1 rework
ST-03
Structural engineer's certificate — Level 3 transfer slab
Design certificate for the post-tensioned transfer slab, signed by the engineer of record.
Structural Engineer
Under review
AF Ana
3 2
Due in 2 days
ST-04
Pre-pour inspection record, ground floor slab and footings
Photos and the signed inspection checklist before each pour.
Accepted
JP Joel
1 6
4 Nov, 2026
Done
ST-07
Geotechnical report — bearing capacity and site classification
Elise Marangoni The report covers the Stage 1 lots only. Upload the Stage 2 addendum.
Structural
Rework
AFRI
5 1
2 days overdue
ST-09
Shop drawings — structural steel canopy over the retail entry, rev C
Unassigned––No due date
Fire safety 5 items
0 accepted · 2 in review · 0 rework
FS-02
Fire engineering brief and performance solution — basement carpark
Performance solution for the extended travel distance on B2, with the peer review letter.
Fire Performance solution Peer review +1
Under review
BOGA +1
8 4
Due today
FS-07
Fire damper installation certificate (AS 1668.1)
Uploaded, not in review
MS Mateo
1
Due in 5 days
FS-11
Hydrant and sprinkler system commissioning report
Fire Hydraulic
Awaiting upload
MS Mateo
–12 Dec, 2026
FS-12
Penetration sealing schedule with product data sheets and photos
Draft approved
BO Bridget
2 3
28 Nov, 2026
FS-15
Emergency lighting and exit sign installation certificate
Awaiting upload
JT Jess
–9 Dec, 2026
Council conditions 4 items
2 accepted · 0 in review · 1 rework
CC-41
Condition 41 — dilapidation report for neighbouring lots 7 and 9
Accepted
GA Grace
2 2
21 Oct, 2026
Done
CC-44
Section 7.12 contributions payment receipt
Accepted
JP Joel
1
18 Oct, 2026
Done
CC-52
Construction traffic management plan, approved by council
Elise Marangoni The approved plan is missing the loading zone. Re-upload the council-stamped copy.
Rework
GA Grace
4 2
5 days overdue
CC-58
Sediment and erosion control plan sign-off
Awaiting upload
RI Ravi
–Due in 3 days
Services and hydraulics 6 items
0 accepted · 1 in review · 0 rework

Add a sub-item

On FS-07 · Fire damper installation certificate (AS 1668.1)

Assignees MSMateo SilvaJTJess Tan Add assignee Only these people and the item's owners can upload here. They get its reminders and approval emails.
Due date Same as item · 4 Nov 2026
Who can see the uploads
Everyone on the item The item's owners and watchers, and the certifier.
Only this sub-item's assignees and the item's owners Uploads stay out of the item feed until they are reviewed.
The certifier only Hidden from the builder's team. Only a project admin can hide uploads from the builder’s team.
Email Mateo and Jess when the sub-item is added Ask for a signed declaration with every upload
Mateo and Jess get an email when you add it.
← All 1Evolution2Calm3Field RequirementsHomeHome, phoneForm dialogEmail header